Understand the result
What the Slope Grade and Fall is for
Convert signed rise or fall over a horizontal run into grade, ratio, angle and fall per unit length.
Jobsite layout turns measured dimensions into marks, offsets, levels, diagonals, or quantities that can be checked before material is cut or fixed.
At a glance
See the field workflow
The relationship
The formula used here
Grade=change/run; angle=atan(change/run).
Apply this relationship only after confirming that the measurements, product basis, allowances, and units describe the same project condition.
Field reading
Use the result as a checked next step
1. Measure the real work
Use field dimensions, approved drawings, and actual product or stock information.
2. Reconcile the result
Use one datum and one unit basis, record the actual field measurements, and verify the calculated layout with an independent diagonal, level, or closure check where possible.
3. Keep the boundary clear
It does not establish structural capacity, survey control, tolerances, code compliance, or an approved construction method.