Understand the result
What the Masonry Wall Tie and Anchor is for
Lay out wall ties/anchors along repeated runs using entered end offsets, maximum spacing, packages and waste.
Masonry takeoff turns wall geometry and openings into modular units, courses, mortar, grout, reinforcement zones, lintels, and bond conditions.
At a glance
See the field workflow
The relationship
The formula used here
Locations per run = ceil(clear run ÷ maximum spacing) + 1; total applies run count and waste before package rounding.
Apply this relationship only after confirming that the measurements, product basis, allowances, and units describe the same project condition.
Field reading
Use the result as a checked next step
1. Measure the real work
Use field dimensions, approved drawings, and actual product or stock information.
2. Reconcile the result
Use actual unit dimensions and joint thickness, lay out openings by course, and keep net units, cuts, mortar, grout, and allowance visible separately.
3. Keep the boundary clear
It does not design masonry, lintels, reinforcement, grout specification, movement joints, support, ties, flashing, or structural capacity.