Understand the result
What the Kerf and Cut-Loss is for
Calculate finished yield, total kerf loss and remaining stock from repeated equal cuts.
Cut planning separates required finished pieces from stock sizes, saw kerf, trim, defects, offcuts, and whole purchasable units.
At a glance
See the field workflow
The relationship
The formula used here
Used length=count×cut length+(count−1 or count)×kerf according to whether a trailing cut is counted.
Apply this relationship only after confirming that the measurements, product basis, allowances, and units describe the same project condition.
Field reading
Use the result as a checked next step
1. Measure the real work
Use field dimensions, approved drawings, and actual product or stock information.
2. Reconcile the result
Enter actual stock and cut dimensions, preserve orientation and grain constraints, then inspect the cut schedule before rounding the order.
3. Keep the boundary clear
It does not assess material grade, defects, moisture, structural suitability, machine setup, or safe cutting practice.
